Direct Tap Methods
The “direct tap” methods are used to connect PLC devices directly to the network
electrical wirings by perforating the cable insulator and the electrical wiring itself.
Such methods require resorting to an electrician authorized to intervene on LV
(low voltage) or MV (medium voltage) electrical networks because of the electrical
hazard.
Figure 7.26 illustrates the operating principle of direct tap coupling.
Transformers and Meters
To design the topology of a PLC network, it is necessary to know the range of the
PLC signal over the electrical network and to identify the points of the network that
may receive this signal. In addition, the PLC network can be secured with this infor-
mation.
Some devices existing on the electrical network where PLC devices are installed
have an influence on the PLC network insofar as they can alter the signal and even
cut it off completely. It is then necessary to inject the signal at locations of the elec-
trical network where the PLC signal may not be cut off. Among the devices of an
electrical network that may cut off the PLC signal, let’s mention the following
devices in particular:
The transformers consisting of two coils used to change the voltage from one
value to another one. These coils act as insulators between two parts of an
electrical network; this is called “galvanic isolation.”
Transformers and Meters 143
Figure 7.26 PLC direct tap coupling